Case Study: ODU achieves faster engineering and reduced lead times with A-dato

A A-dato Case Study

Preview of the ODU Case Study

ODU reduces engineering lead times by up to 30% with A-dato

ODU, a family-owned Bavarian manufacturer of high-quality electrical connectors with over 1,500 employees in Germany, faced declining project performance as the company grew. Projects were increasingly delayed and the organization struggled with managing concurrent initiatives, creating a state of congestion. This challenge led them to begin a transformation journey with vendor A-dato.

By implementing A-dato's solution, ODU achieved a significant acceleration in its engineering processes. The offer phase became much faster and engineering execution was accelerated multifold. More complex projects saw their lead times reduced by up to 30%. A-dato enabled these substantial improvements in speed and flow without the need for ODU to increase its headcount.


View this case study…
ODU logo

ODU


A-dato

5 Case Studies